Saturday, December 19, 2009
Friday, December 18, 2009
Lots of updates
I've been really busy lately, so my chocolate oatmeal stout and Athena's honey brown ale have been sitting on secondary for three weeks or so. In that time, I ordered the hardware/plumbing for the keezer and came up with a more conventional (cheaper) design and Athena even picked up her own Corny keg.
Keezer Hardware:
Athena came home today with her keg and I got my drip tray and rubber shelf mats in the mail. We siphoned both beers into their respective kegs, slowly brought the pressure up to 30PSI while aerating over the coarse of about 30 minutes, then let them chill while we went shopping for dinner. We cooked up some rib eyes with mashed potatoes and sauteed veggies just in time for our beers to get cold and fizzy.
Nothing like a home cooked meal with a home brewed beer.
Keezer Hardware:
- Perlick Stainless Faucets with handles (x3)
- 4" Stainless Steel Shanks (x3)
- CO2 and Beer Hoses (12' of each)
- 3/4" Oak
- 1/4" Furniture-grade Plywood
- 2" Mold-resistant Styrofoam Insulation
- Weather Stripping
Athena came home today with her keg and I got my drip tray and rubber shelf mats in the mail. We siphoned both beers into their respective kegs, slowly brought the pressure up to 30PSI while aerating over the coarse of about 30 minutes, then let them chill while we went shopping for dinner. We cooked up some rib eyes with mashed potatoes and sauteed veggies just in time for our beers to get cold and fizzy.
Nothing like a home cooked meal with a home brewed beer.
Wednesday, November 18, 2009
Officially Obsessed
Last weekend Tom and I racked his Pliny of the Elder clone and my Fat Tire clone to secondary. Then on Monday and Tuesday, Athena and I made a batch of Honey Brown Ale and a Chocolate Oatmeal Stout respectively.
That means there are 20 gallons of beer fermenting in my garage as we speak (or type)
Chocolate Oatmeal Stout on the left, Honey Brown Ale on the right
Saturday, November 14, 2009
Now it's a Keezer
Today I wired up my inline temperature controller and set it to 38F. It was way easier than I thought and the whole thing only took about 15 minutes.
Saturday, November 7, 2009
Kegs are here
Woke up this morning with a big box from Midwest Brewers Supply on my doorstep:
I also got my inline temperature controller so I can turn my chest freezer into a refrigerator. Right now I have all the components to build phase one of the Keezer, so I think that will be my project this weekend.
I also got my inline temperature controller so I can turn my chest freezer into a refrigerator. Right now I have all the components to build phase one of the Keezer, so I think that will be my project this weekend.
Thursday, November 5, 2009
Brew Day +1
Less than 24 hours after pitching my yeast I had an airlock full of foam! It has since died down, but I still have a nice krausen...yeast starter ftw.
Wednesday, November 4, 2009
Brew Day!!
Today I bought the last of the equipment needed to start brewing:
Now I'm just going to cover it up and let the yeast do their thing.
- 20qt Stainless Steel Stew Pot
- Metal Brewer's Spoon
- Wine Thief
- Rubbermaid Bin (to fill w/ ice to cool my wort)
Now I'm just going to cover it up and let the yeast do their thing.